Car parks are busy

ALL car parks are very busy over the Easter period, with limited drive-up spots available. Please consider alternative transport options. Please have your QR code ready for a smooth entry and exit. Our roads and car parks may have changed since your last visit. Due to ongoing construction in the T123 car park pick-up and drop-off areas, passengers should plan for potential delays of up to an hour during peak times. Learn about the Naarm Way Stage 2 project to plan ahead: https://www.melbourneairport.com.au/plan-ahead. To avoid congestion, we recommend using the equivalent pick-up and drop-off facilities at nearby Terminal 4 car park, just a short 10-minute walk from Terminals 1, 2, and 3. Simply drive to the Terminal 4 Car Park and proceed to Level 2 for drop-offs or Level 1 for pick-ups. Thank you for your patience.

Avis d’activité d’accès aux terres (LAAN)

Aperçu

L’aéroport de Melbourne est situé sur les terres du Commonwealth et est soumis à la loi sur les aéroports de 1996 (Cth) ainsi qu’à des restrictions accrues en matière de sécurité, de construction, de patrimoine et d’environnement. Si vous prévoyez d’effectuer des travaux de maintenance ou d’apporter des modifications à une installation de télécommunications existante sur un site ou une location à l’aéroport de Melbourne, ou si vous cherchez à installer une nouvelle installation de télécommunications à l’aéroport de Melbourne, vous devrez obtenir l’approbation de l’aéroport de Melbourne (en tant que société de location de l’aéroport) et du contrôleur des bâtiments de l’aéroport (ABC) avant de commencer tout travail.

De plus amples informations sur le processus de demande d’approbation de construction peuvent être trouvées ici.

Pour obtenir de l’aide, contactez LAAN@melair.com.au.