ALL car parks are very busy this Labour Day long weekend, with limited drive-up spots available. Please consider alternative transport options.  If you do have a car park booking, please have your QR code ready for a smooth entry and exit and allow extra time to find a spot. Our roads and car parks may have changed since your last visit. Due to ongoing construction in the T123 car park Pick up and Drop off areas, passengers should plan for potential delays of up to an hour during peak times. Learn more about the Naarm Way Stage 2 project: https://www.melbourneairport.com.au/plan-ahead To avoid congestion, we recommend using the equivalent pick-up and drop-off facilities at nearby Terminal 4 car park, just a short 10-minute walk from Terminals 1, 2, and 3. Simply drive to the Terminal 4 Car Park and proceed to Level 2 for Drop off or Level 1 for Pick up. Thank you for your patience while we are building your airport.

2025 年经济和社会影响报告

墨尔本机场的 2025 年经济和社会影响报告量化了机场对维多利亚州经济和社区的重大贡献。该报告是与 ConnellGriffin 合作编写的,展示了墨尔本机场作为该州主要经济驱动力的作用,支持维多利亚州的就业机会并通过社区倡议创造社会价值。


在此处下载 2025 年经济和社会影响报告 

澳大利亚太平洋机场公司向《航空绿皮书》提交文件

澳大利亚太平洋机场公司 (APAC) 向澳大利亚政府的《航空绿皮书:迈向 2050 年》提交了此文件。该文件概述了亚太地区关于如何实现澳大利亚航空政策设置现代化以解决当前问题并为未来可持续和富有成效的航空业奠定基础的建议。

在此处查看提交的内容。

在此处查看情况说明书。