Plan ahead: Allow extra travel time to Melbourne Airport

PSA: Centre Road will be fully closed to traffic for beam lifts as part of Naarm Way Stage 2 construction. Closure Times: Feb 5, 2025, 11 PM – 4 AM (Feb 6) Feb 6, 2025, 11 PM – 4 AM (Feb 7) Plan ahead and follow detour signs. If you’re heading to the airport over January to early March 2025, we encourage you to allow an extra 30 minutes for your journey due to potential delays caused by construction works in the Terminal 123 forecourt. If you're picking up or dropping off loved ones, consider using Exit 19A and the Terminal 4 Car Park to avoid congestion in the Terminal 123 forecourt. We apologise for the inconvenience.

Small Holdings

Baked with love, brewed to perfection. Small Holdings is an artisan bakery and café offering freshly baked pastries, handmade sandwiches, and locally sourced delights. Partnering with ST. ALi Coffee, this cozy spot captures the essence of Melbourne's coffee culture.

Similar in Eat & Drink