PSA: Centre Road will be fully closed to traffic for beam lifts as part of Naarm Way Stage 2 construction. Closure Times: Feb 5, 2025, 11 PM – 4 AM (Feb 6) Feb 6, 2025, 11 PM – 4 AM (Feb 7) Plan ahead and follow detour signs. If you’re heading to the airport over January to early March 2025, we encourage you to allow an extra 30 minutes for your journey due to potential delays caused by construction works in the Terminal 123 forecourt. If you're picking up or dropping off loved ones, consider using Exit 19A and the Terminal 4 Car Park to avoid congestion in the Terminal 123 forecourt. We apologise for the inconvenience.

Valve Isolation

Overview

Any isolations of Melbourne Airport civil water supply network must complete the ‘Valve Isolation Application.’

 Where a water supply valve isolation is required and the isolation will impact fire services, such as fire hydrants, hose reels and sprinkler supply water, the works will require both a valve isolation application and a fire impairment application.

 The valve isolation application process shall be completed first, with the approved documentation submitted as part of the fire impairment application.

How to apply for a permit

  1. Complete the Valve Isolation Application and ensure:

    a. A drawing of the location is provided
    b. Details of Fire Hydrant to be isolated (if relevant).
  2. Email to [email protected]
  3. Application on approval will be returned to applicant
  4. If you are required to apply for a ‘Fire Impairment/Hot Work Permit’ The ’Valve Isolation Application’ must be attached to the Fire Impairment application along with the drawings.
  5. Contact APAM Approved Isolation Plumber prior to commencing works and on completion, contact details will be on the approved application.

Download the application form by clicking here.